Create Alarm Rule
Critical
2
Requires immediate action
High
1
Needs attention soon
Warning
2
Monitor closely
Info
0
Informational
Resolved Today
0
Successfully handled
CRITICAL 3 minutes ago

Server Rack A - Temperature Exceeded

Temperature reading of 87.2°C exceeds critical threshold of 80°C 87.2°C

Data Center server-rack-001 Active for 8 min
CRITICAL 8 minutes ago

Chiller-3 Power Surge Detected

Power consumption at 152.4 kW exceeds maximum rated capacity of 140 kW 152.4 kW

Building B chiller-003 Active for 15 min
HIGH 15 minutes ago

Cooling Unit Efficiency Drop

Operating efficiency at 72%, below optimal threshold of 85% 72%

Data Center cooling-unit-001
WARNING 23 minutes ago

HVAC Zone 2 Humidity Warning

Humidity at 68%, approaching upper limit of 70% 68%

Building B hvac-zone-002
INFO 45 minutes ago

Scheduled Maintenance Window

Planned maintenance for Chiller-4 scheduled to begin in 2 hours

Building B chiller-004

Jixie Analysis

Root Cause: Server Rack A temperature spike likely caused by reduced cooling efficiency. Recommend checking Cooling Unit connection.
Pattern Detected: Chiller-3 power surges correlate with peak load times. Consider load balancing with Chiller-4.
Prediction: Based on current trends, HVAC Zone 2 humidity will exceed threshold in ~45 minutes without intervention.

Recent Timeline

View full timeline →

Today's Stats

Total Alarms 53
Mean Time to Acknowledge 4.2 min
Mean Time to Resolve 23 min
Auto-resolved 18 (34%)